About
The Terrahex Advantage
Team
Bitcoin & Mining
How Terrahex Survives turmoil
Operations
FAQs
Contact Us
About
The Terrahex Advantage
Team
Bitcoin & Mining
How Terrahex Survives turmoil
Operations
FAQs
Contact Us
About
The Terrahex Advantage
Team
Bitcoin & Mining
How Terrahex Survives turmoil
Operations
FAQs
Contact Us
About
The Terrahex Advantage
Team
Bitcoin & Mining
How Terrahex Survives turmoil
Operations
FAQs
Contact Us
Operations
Terrahex operations are built on a foundation of efficiency. By deploying hardware powered by stranded energy through Joint Venture structures, we maintain a structurally lower cost per Bitcoin than the global average.
Terrahex Operational Footprint
Delaware
Terrahex Digital Assets Corp
Parent Company — Investor Governance
Abu Dhabi
Terrahex Digital Holdings Limited
Operational Headquarters
Nigeria Operations
Kwale
Site
Initial Deployment
Power Source
17.4MW Gas Turbine (N+1)
Compute Capacity
9 MW
Lagos
Site
Phase 2 Deployment
Power Source
5 MW Turbine
Compute Capacity
1 MW
Afisiere
Site
Phase 2 POC
Power Source
22.5MW Gas Turbines
Compute Capacity
9 MW
© 2026 Terrahex Digital Holdings Corp. All rights reserved
LinkedIn
|
Investor Login