Operations

Terrahex operations are built on a foundation of efficiency. By deploying hardware powered by stranded energy through Joint Venture structures, we maintain a structurally lower cost per Bitcoin than the global average.

Terrahex Operational Footprint

Delaware

Terrahex Digital Assets Corp
Parent Company — Investor Governance

Abu Dhabi

Terrahex Digital Holdings Limited
Operational Headquarters

Nigeria Operations

Kwale
Site Initial Deployment
Power Source 17.4MW Gas Turbine (N+1)
Compute Capacity 9 MW
Lagos
Site Phase 2 Deployment
Power Source 5 MW Turbine
Compute Capacity 1 MW
Afisiere
Site Phase 2 POC
Power Source 22.5MW Gas Turbines
Compute Capacity 9 MW

© 2026 Terrahex Digital Holdings Corp. All rights reserved